233D Transmitter Restoration Project

Getting Started
 
This Autotune section is the crystal-controlled oscillator section.
Thanks Lawrence,

We are currently getting together on Wednesday’s at 11 in the museum to work on the Collins 233D project.

We are planning a “kick-off” session on February 6. Plan to meet for lunch in the 120 cafeteria (Dutch treat) and then review the progress at the transmitter.

Rod is going most of the RF cabinet work and Jules is working on the Autotune system. I’m pretty much the gofer doing whatever is needed to keep the project moving.

Hope to see everyone there on the 6th or any other time for that matter.

73
Jim WØNKN